Mariposa Chalet

The essentials, in an open studio facing the forest.

Area
35 m²
Build time
120 days
Bedrooms
Studio
Levels
Single level
Mariposa Chalet, facade illustration
Architectural renders based on the style and delivery of BioConstrutora.

Inside the Mariposa

A compact studio for vacation stays, rental income or for anyone who lives alone and works from home. Double bed, living area, a table for two and a work counter in one space, with the deck porch right outside.

Included in the chalet

Finishes and utilities per the specification of the Mariposa Chalet.

Water and bath

Main and shower valves, showerheads, drains, bidet sprayers and faucets for the bathroom, laundry and kitchen.

Fixtures and basins

Bathroom, laundry and kitchen basins, siphon kit and toilet.

Finished countertops

Bathroom countertop (0.90 × 0.60 m) and kitchenette countertop, finished in masonry with burnished cement, linen curtains and native-wood shelves.

Lighting and electrical

Wall sconces and pendants, spotlight tracks, outlets and switches.

Hardware

Door handles, locks, latches, hinges, pulls and bolts.

Build your Mariposa Chalet

Choose the add-ons you want for the chalet and request a quote with your selection. The price comes in writing.

Gourmet porch packages
Individual items
Leblon Aguazul poolLeblon Aguazul poolInstalled with filter and pump.
Covered pergolaCovered pergolaEucalyptus with clear polycarbonate.
Water reserveWater reserveFortlev tank with pump, for more day-to-day autonomy.
Eco brick barbecue
Outdoor cold-water showerWith round eucalyptus frame and floor.
Garden faucet
Extra outlet
Extra light fixture
Ceiling fan1 m blade radius, already installed.
Air conditioning9,000 BTU, installed.
Add-ons selected0See summary

Request your quote for the Mariposa Chalet

Tell us a little about yourself and where you are. Clarice replies on WhatsApp and schedules a video call, no strings attached.

  • A quote made for you, sent one to one
  • Free first video call
  • Final quote in writing, made for you

When you send, we open WhatsApp with your message ready. We use your data only to answer your request.

120 days from the first day of construction to the key

The schedule of the Mariposa Chalet, stage by stage, in calendar days. The margin for rain and the unexpected is already built into the timeline.

  1. Foundation and raised base Days 1–oNaN days
  2. Eucalyptus structure Days o1–uNaN days
  3. Walls and utilities Days u1–aNaN days
  4. Roof Days a1–oNaN days
  5. Doors and windows Days o1–oNaN days
  6. Finishes, countertops and fixtures Days o1–iNaN days
  7. Final cleaning and inspection Days i1–iNaN days
  8. Margin for rain and the unexpected Days i1–aNaN days

Before day 1: 30 days of pre-build, with project approval, water and power, clearing the plot and planning. City hall approvals run separately. Understand the path

Layout of the chalet

  • Single level
  • Open studio: double bed, living area, table for two and work counter
  • Kitchenette with sink, cooktop and mini fridge
  • 1 bathroom with glass shower enclosure, toilet and basin
  • Front deck porch
  • Total proposed area: 35 m²

Materials

Structure
Treated round eucalyptus posts
Walls
Wood cladding
Roof
Gable roof with green tiles
Base
Stilts (pilotis) or raised slab
Flooring
Wood
Doors and windows
Wood and glass

Execution

Pre-build
30 days, before the first day of construction
Build time
120 calendar days, with a margin for rain and the unexpected
Water tank
1,000 L
Utilities
Electrical and plumbing per the designs
Planning
Weekly, with the LPS method, and scheduled site visits
Warranty
30 days for services, with 24-hour support, and 1 year for products and structure