Ninho House

A refuge for living and dreaming.

Area
65 m²
Build time
120 days
Bedrooms
1 bedroom in the loft
Levels
Ground floor and loft
Ninho House, facade illustration
Facade, with the loft on the upper level. Illustrative render.

Inside the Ninho

The coziness of a cabin with the openness of a loft. A bedroom in the loft with a wooden balcony, and the only house in the catalog with a green roof.

Ninho House: two-level facade in wood and eco brick, with a pergola and deck porch
Facade, with the loft on the upper level. Illustrative render.
Ninho House: living area with high ceilings, a wooden staircase and the loft with its railing
Living area with the staircase and the loft. Illustrative render.

1 / 2

Included in the house

Finishes and utilities per the specification of the Ninho House.

Water and bath

Main and shower valves, showerheads, drains, bidet sprayers and faucets for the bathroom, laundry and kitchen.

Fixtures and basins

Bathroom, laundry and kitchen basins, siphon kit and toilet.

Outdoor powder room

Toilet and sink in an outdoor powder room, with the plumbing and wall finish.

Finished countertops

1 bathroom, 1 kitchen, 1 laundry and 1 wardrobe (2.00 × 0.80 m), finished in masonry with burnished cement, linen curtains and native-wood shelves.

Lighting and electrical

Wall sconces and pendants, spotlight tracks, outlets and switches.

Hardware

Door handles, locks, latches, hinges, pulls and bolts.

Wall finish and protection

Ceramic or burnished cement in wet areas and resin over the eco brick inside.

Build your Ninho House

Choose the add-ons you want for the house and request a quote with your selection. The price comes in writing.

Gourmet porch packages
Individual items
Leblon Aguazul poolLeblon Aguazul poolInstalled with filter and pump.
Covered pergolaCovered pergolaEucalyptus with clear polycarbonate.
Water reserveWater reserveFortlev tank with pump, for more day-to-day autonomy.
Eco brick barbecue
Outdoor cold-water showerWith round eucalyptus frame and floor.
Garden faucet
Extra outlet
Extra light fixture
Ceiling fan1 m blade radius, already installed.
Air conditioning9,000 BTU, installed.
Add-ons selected0See summary

Request your quote for the Ninho House

Tell us a little about yourself and where you are. Clarice replies on WhatsApp and schedules a video call, no strings attached.

  • A quote made for you, sent one to one
  • Free first video call
  • Final quote in writing, made for you

When you send, we open WhatsApp with your message ready. We use your data only to answer your request.

120 days from the first day of construction to the key

The schedule of the Ninho House, stage by stage, in calendar days. The margin for rain and the unexpected is already built into the timeline.

  1. Foundation and raised slab Days 1–oNaN days
  2. Eucalyptus structure and loft Days o1–uNaN days
  3. Walls (brick and Lightwall) and utilities Days u1–aNaN days
  4. Roof and green roof Days a1–oNaN days
  5. Doors and windows Days o1–oNaN days
  6. Finishes, countertops and fixtures Days o1–iNaN days
  7. Final cleaning and inspection Days i1–iNaN days
  8. Margin for rain and the unexpected Days i1–aNaN days

Before day 1: 30 days of pre-build, with project approval, water and power, clearing the plot and planning. City hall approvals run separately. Understand the path

Layout of the house

  • Ground floor and loft
  • Living, dining and kitchen in one space, on the ground floor
  • 1 bedroom in the loft, with a wooden balcony
  • Bathroom in the loft
  • Outdoor powder room, with toilet and sink
  • Front porch and covered outdoor service area
  • Green roof over part of the ground floor
  • Total proposed area: 65 m²

Materials

Base
Raised slab 45 cm above the ground
Structure
Treated round eucalyptus
Exterior walls
Exposed eco brick and wood
Interior walls
Lightwall
Loft roof
Burgundy Onduline with waterproofing membrane
Green roof
Vegetation, waterproofing and drainage
Ceiling
Pine
Loft and balcony
Wood
Doors and windows
Wood and glass
Ground floor
Burnished cement

Execution

Pre-build
30 days, before the first day of construction
Build time
120 calendar days, with a margin for rain and the unexpected
Water tank
1,000 L
Utilities
Electrical and plumbing per the designs
Planning
Weekly, with the LPS method, and scheduled site visits
Warranty
30 days for services, with 24-hour support, and 1 year for products and structure